I had everything ready — made sure there was no bare wire sticking out from beneath the wire grommet thingies, minimum separation of communication and power wires, smoke detector location, minimum 6 inches of wiring inside the boxes, etc, etc, etc. Did the inspector dude even LOOK at anything? Nope. Came in, scanned the room, signed off and left. 5 minutes — TOPS. Bah. I guess I should be grateful it passed so easily. There must not have been any red flags indicating a deeper inspection is required. Ah well, it’s clear to cover with drywall now.
Well done bro …. its the best kinda of inspection to have.
Letsget some action down there I’m bored and wanna watch somewone working