Skip to content

The Perpetual Weblog

Filled With Those Events That Alter and Illuminate Our Times

Menu
  • About
Menu

Bathroom Nears completion.

Posted on June 28, 2009 by Scott

On a more positive note, we’ve been working on finishing the house, witht he two big projects being underfloor insulation and the upstairs bathroom. We’ve lived with that one unfinished room for 12 odd years. I liked the plywood floor, the gree drywall thepiled up building material in the corner. It was homey. Now we have that the buildiner electician in and its going to be like this. 1) The areas that was the sink is walled off to create a linen cupboard opening into the hall. 2) A bench and drawer unit with two butlers sinks was made for us out of matai timber we had stored in the garage. 3) Dark terrocata tiles ont he floor and white on the walls and shower with muclti coloured trim. It looks much better than it sounds, 4) glass shower. It will be very classy.

6 thoughts on “Bathroom Nears completion.”

  1. Joan says:
    June 30, 2009 at 09:52

    Wow–sure sounds classy!! How about some pictures–of that and the kitchen–so we get a new image in our minds.

  2. Ian says:
    July 2, 2009 at 10:01

    Sounds nice. About time! (-: I think I’ve done 2 bathrooms since you started that!

  3. Scott says:
    July 3, 2009 at 20:54

    rember I build two whole houses … how many have you built? 🙂

  4. Ian says:
    July 4, 2009 at 17:26

    Ah. The sibling “one up man ship” continues!

  5. Scott says:
    July 5, 2009 at 15:47

    And i’m winning ……

    I feel like chatting with you bro … how are you doing other than being self confessed fat, lazy and bald .. or was it fat lazy and stressed??

  6. Ian says:
    July 6, 2009 at 09:59

    Stressed, yes….but bald is also an apt description.

Leave a Reply Cancel reply

Your email address will not be published.

©2025 The Perpetual Weblog | Built using WordPress and Responsive Blogily theme by Superb